Physical route and sequence
Define load point, trans-shipment, intermediate storage, discharge and destination. Each leg should have an accountable party and credible time window.
Commodity Knowledge Centre
Test whether the proposed physical movement can actually be executed with the right vessel or barge, terminal, route, timing and logistics documentation.
Treat each control as a separate evidential question. A credible transaction should remain coherent when the documents, parties and physical sequence are tested together.
Define load point, trans-shipment, intermediate storage, discharge and destination. Each leg should have an accountable party and credible time window.
Verify identity, IMO where applicable, type, capacity, flag, class, status and availability. A vessel name on a document is not evidence of a confirmed nomination.
Check draft, LOA, manifold, segregation, pumping, safety and product restrictions. The asset must be able to berth, load/discharge and depart.
Distinguish an indication from a fixture, charter party, nomination and terminal acceptance. Each stage carries a different evidential weight.
Test bills of lading, cargo manifests, NOR, ullage, certificates, port records and tracking against issuer, dates and the actual voyage. Chronological consistency matters.
Include freight, barging, handling, storage, demurrage, insurance and delay. Poor logistics economics can erase an apparently attractive trading margin.
Record what is confirmed, what remains unverified, the residual risk, the conditions precedent and one explicit decision state.
Evidence supports proceeding.
Proceed only after stated conditions are satisfied.
Pause until material evidence is obtained.
Risk or missing evidence makes continuation indefensible.
No. AIS can help verify identity and movement, but the connection to a cargo and transaction requires additional documentation and corroboration.
No. It may evidence a specific shipment at a specific time; it still needs authentication and linkage to the transaction under review.
Because delays, terminal windows and capacity constraints can destroy margin or create disputes even where the commodity and counterparties are legitimate.
Use this module together with the other Commodity Knowledge Centre controls and the MGS DD1/DD2/DD3 methodology. If a real transaction requires review, start with a preliminary assessment before committing to a full mandate.